|
Tripping And Laying Pipe Down
Sedco, Inc
|
1977 |
Sedco, Inc |
19 min |
|
|
Stability And Trim
Pt. 1. Sedco, Inc
|
1977 |
Pt. 1. Sedco, Inc |
|
|
|
Sedco ’76
Sedco, Inc
|
1977 |
Sedco, Inc |
11 min |
|
|
Repair Of Damaged Tooljoints
Sedco, Inc
|
1977 |
Sedco, Inc |
21 min |
|
|
Proper Care Of Tooljoints
Sedco, Inc
|
1977 |
Sedco, Inc |
19 min |
|
|
Power End
Sedco, Inc
|
1977 |
Sedco, Inc |
19 min |
|
|
Identification Of Drillpipe
Sedco, Inc
|
1977 |
Sedco, Inc |
22 min |
|
|
Conclusion
Sedco, Inc
|
1977 |
Sedco, Inc |
18 min |
|