| 1944 |
O Emprego do Suporte Fixo |
U.S. Office of Education in cooperation with U.S. Office of the Coordinator of Inter- American Affairs, (Trabalho 1945. de oficina mecanica. Usos do tomo de precisao) Portuguese version of "Using a Steady Rest." Spanish version "El Uso del Soporte Fijo", also available. 62-Port.; 25 minutes) 32, Empress of Ireland-Storstad Incident U.S. Department of the Navy, (Rules of the Nautical Road Se Title self-explanatory. (MN 202-w; minutes) Endfeed Grinding a Tapered Pin U.S. Office of Education |
|
16mm |
|
|
| 1944 |
Pact Typhus in Naples |
U.S. Department of the Navy |
11 min |
16mm |
Color |
|
| 1944 |
Painting Ships Bottoms: Hot and |
Cold Plastic; Anti-Fouling Paint U.S. Department of the Navy |
10 min |
16mm |
|
|
| 1944 |
Placing Sliding Ways |
U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
Preflight Procedure |
U.S. Department of the Navy |
52 frames |
Filmstrip |
|
|
| 1944 |
Principles of Operation (AN/ARN-1) |
U.S. Department of the Navy |
67 frames |
Filmstrip |
|
|
| 1944 |
Relative Movement. Part 1: Relative |
Movement and Interception: Air U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
Relative Movement. Part 2: Out and |
In Search: Relative Wind U.S. Department of the Navy |
12 min |
16mm |
|
|
| 1944 |
Removal and Replacement of Main |
Bearings U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
Removal of Cylinder Liner |
U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
Removal of Injection Nozzles, Etc. |
U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
Removal of Pistons |
U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
Replacement of Cylinder Liner |
U.S. Department of the Navy |
27 min |
16mm |
|
|
| 1944 |
Replacement of Injection Nozzles, |
Etc. U.S. Department of the Navy |
6 min |
16mm |
|
|
| 1944 |
Replacement of Pistons |
U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
Rough Grinding: Spherical Surfaces |
U.S. Office of Education with the cooperation of the U.S. Department of the Navy |
57 frames |
Filmstrip |
|
|
| 1944 |
Safety for Welders: Use of Welding |
Protective Equipment U.S. Department of the Navy |
7 min |
16mm |
|
|
| 1944 |
Safety in Navy Yards |
U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
Skills Series. Sheetmetal |
(Shipbuilding Work) Triangulation method in development of a pattern from making blueprint to full scale plan; cutting the metal; dressing; hammering; and checking for squareness. Supplementary filmstrip, same title, also available. (MN 2339-d; 17 filmminutes) (OE 41 2, 41 Transmission Security U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
Spherical Surfaces |
k U.S. Office of Education, with the cooperation of the U.S. Department of the Navy |
27 min |
16mm |
|
Sound |
| 1944 |
Superheat Control |
U.S. Department of the Navy, 19 (Fireroom Operation Series) How light off saturated furnace; light superheater when steam reaches 600 I increase superheat temperature; secure superheater. (MN 2356-f; minutes) Supervising Women Workers U.S. Office of Education |
11 min |
16mm |
|
|
| 1944 |
Synchro systems. Part 1 |
U.S. Department of the Navy |
13 min |
16mm |
|
|
| 1944 |
TION PICTURES 173 |
Simple Foundation. Part 2: Duplication and Fabrication U.S. Department of the Navy |
16 min |
16mm |
|
|
| 1944 |
V: Air. Part 1 |
U.S. Department of the Navy |
15 min |
16mm |
|
|
| 1944 |
Watertight Cover. Part 1: Layout |
and Fabrication U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
Weather for the Navigator |
U.S. Department of the Navy |
9 min |
16mm |
|
|
| 1944 |
Weather Map Symbols: Navy Quiz |
No. 44 U.S. Department of the Navy |
87 frames |
Filmstrip |
|
|
| 1943 |
288 U.S. GOVER |
Servicing Hydraulic Systems U.S. Department of the Navy |
49 frames |
Filmstrip |
|
|
| 1943 |
Airway Aids |
U.S. Department of the Navy |
73 frames |
Filmstrip |
|
|
| 1943 |
Airway Aids |
U.S. Department of the Navy |
73 frames |
Filmstrip |
|
|
| 1943 |
Altitude |
U.S. Department of the Navy |
|
Filmstrip |
|
|
| 1943 |
Beach Approaches |
U.S. Department of the Navy |
41 min |
16mm |
|
|
| 1943 |
Bench Work: 8-268A Engine |
U.S. Department of the Navy |
16 min |
16mm |
|
|
| 1943 |
BMEP |
U.S. Department of the Navy |
|
16mm |
|
|
| 1943 |
Bomb Blast and Burns |
40. U.S. Department of the Navy |
13 min |
16mm |
Color |
|
| 1943 |
Capacitance: Parts 1 and 2 |
U.S. Department of the Navy |
30 min |
16mm |
|
|
| 1943 |
Care and Repair of Flight Controls |
U.S. Department of the Navy |
68 frames |
Filmstrip |
|
|
| 1943 |
Cleaning the Airplane |
U.S. Department of the Navy |
41 frames |
Filmstrip |
|
|
| 1943 |
Diesel Engine Governors. Part 2: |
GM Series 71, Limiting Speed Mechanical Governor U.S. Department of the Navy |
12 min |
16mm |
|
|
| 1943 |
Diesel Engine Marquette Hydraulic |
Governors: Basic Hydraulic Governor U.S. Department of the Navy |
17 min |
16mm |
|
|
| 1943 |
Emergency Seaplane Repair |
U.S. Department of the Navy |
43 frames |
Filmstrip |
|
|
| 1943 |
Factors in the Construction of Full |
Mandibular and Maxillary Denture U.S. Department of the Navy |
40 min |
16mm |
Color |
|
| 1943 |
Fillet Welds |
U.S. Department of the Navy |
|
Filmstrip |
|
|
| 1943 |
G and You |
U.S. Department of the Navy |
|
16mm |
|
|
| 1943 |
GOVERNMENT FILMS |
form nized microgroove disc, 14 minutes, or discript) uire- Oil Systems U.S. Department of the Navy |
52 frames |
Filmstrip |
|
|
| 1943 |
GOVERNMENT FILMS |
s: craft direction and position; fan markers used. Revision, "Radio Navigation. Part 39 1: The Radio Range," also available. (SN 1059-g; 57 frames, synchronized disc, 25 minutes) ng 5 Radio Navigation. Part 2: Bracketing 7 U.S. Department of the Navy |
57 frames |
Filmstrip |
|
|
| 1943 |
Gyroscopic Instruments |
U.S. Department of the Navy |
66 frames |
Filmstrip |
|
|
| 1943 |
Handling Seaplanes on Land |
U.S. Department of the Navy |
36 frames |
Filmstrip |
|
|
| 1943 |
How eggs are weighed, graded, packed, |
stored, and shipped by express, truck, 42. and freight; four principal grades of U.S. eggs. Revision. (53 frames) s, Marshall, Gilbert, and Ellice Islands U.S. Department of the Navy |
53 frames |
Filmstrip |
|
|
| 1943 |
How soldiers in combat |
depend on "Big Four": artillery's big guns and shells, bombs, trucks, and tires; how Allied armies advancing toward Germany were supplied after Normandy beachhead was secured. (M 1077; 18 minutes) 41 The Warm Front U.S. Department of the Navy |
18 min |
16mm |
|
|