| 1943 |
Hydraulic Struts |
U.S. Department of the Navy |
37 frames |
Filmstrip |
|
|
| 1943 |
Ice Formation on Aircraft. Part 1: |
How and Where Ice Forms. Part 2: Review U.S. Department of the Navy |
47 min |
16mm |
|
|
| 1943 |
ICTURES 119 |
Meeting Steam Vessels U.S. Department of the Navy |
17 min |
16mm |
|
|
| 1943 |
Immelman |
U.S. Department of the Navy |
10 min |
16mm |
|
|
| 1943 |
Inductance. Parts 1 and 2 |
U.S. Department of the Navy |
|
16mm |
|
|
| 1943 |
Launching |
U.S. Department of the Navy |
18 min |
16mm |
|
|
| 1943 |
Lesser Sunda Islands |
U.S. Department of the Navy |
92 frames |
Filmstrip |
Color |
|
| 1943 |
Loops |
U.S. Department of the Navy |
13 min |
16mm |
|
|
| 1943 |
Magnetic Instruments |
7 U.S. Department of the Navy |
55 frames |
Filmstrip |
|
|
| 1943 |
Maintenance of Office Machines |
U.S. Department of the Navy |
44 |
16mm |
B&W |
sound |
| 1943 |
Musca Domestica |
44. U.S. Department of the Navy |
10 frames |
Filmstrip |
|
|
| 1943 |
PICTURES 163 |
Rules in Fog. Parts 1 and 2 U.S. Department of the Navy |
16 min |
16mm |
|
|
| 1943 |
Piloting: Surface. Parts 1 and 2 |
U.S. Department of the Navy |
16 min |
16mm |
|
|
| 1943 |
Power Plant Controls |
U.S. Department of the Navy |
45 frames |
Filmstrip |
|
|
| 1943 |
Radio Navigation. Part 1: |
Range Flying U.S. Department of the Navy |
|
Filmstrip |
|
|
| 1943 |
Radio Navigation. Part 3 |
U.S. Department of the Navy |
|
Filmstrip |
|
|
| 1943 |
Reassembly of Piston |
U.S. Department of the Navy |
10 min |
16mm |
|
|
| 1943 |
Reassembly: 8-268 A Engine |
U.S. Department of the Navy |
24 min |
16mm |
|
|
| 1943 |
Rebasing Full Dentures |
U.S. Department of the Navy, 194 (Dental Prosthetic Laboratory Technique Series) Title self-explanatory. 5372-j; 40 frames, color, synchronized disc, 20 minutes) Reciprocating Engine Construction U.S. Coast Guard |
65 frames |
Filmstrip |
|
|
| 1943 |
Refueling the Airplane |
U.S. Department of the Navy |
40 frames |
Filmstrip |
|
|
| 1943 |
Rigging Changes After Flight |
U.S. Department of the Navy |
43 frames |
Filmstrip |
|
|
| 1943 |
Security and Refueling with Safety |
U.S. Department of the Navy |
30 min |
16mm |
|
|
| 1943 |
Servicing Hydraulic Systems |
U.S. Department of the Navy |
51 frames |
Filmstrip |
|
|
| 1943 |
Shallow Water Diving. |
U.S. Department of the Navy |
|
16mm |
|
|
| 1943 |
Skeletal Fixation by the Stader |
Splint: Fractures of the Oscalsis U.S. Department of the Navy |
10 min |
16mm |
|
|
| 1943 |
Skeletal Fixations of Fractures of |
the Mandible U.S. Department of the Navy |
9 min |
16mm |
Color |
|
| 1943 |
Supercharging Diesel Engines |
g U.S. Department of the Navy |
16 min |
16mm |
|
|
| 1943 |
Taxiing in Heavy Weather |
U.S. Department of the Navy |
|
16mm |
|
|
| 1943 |
Taxiing in Moderate Winds |
U.S. Department of the Navy |
13 min |
16mm |
|
|
| 1943 |
The Sextant: Surface. Parts 1, 2r |
and 3 U.S. Department of the Navy |
32 min |
16mm |
|
|
| 1943 |
Time In The Air. |
U.S. Department of the Navy |
12 min |
35mm |
|
sound |
| 1943 |
Time. Parts 1, 2 and 3 |
U.S. Department of the Navy |
57 min |
16mm |
|
|
| 1943 |
Tool Box. Part 1: Bottom and Sides |
U.S. Department of the Navy |
|
Filmstrip |
|
|
| 1943 |
Traditions, customs, civic duties, school, |
and army, physical training, character, psychology of a Japanese boy, Taru. (SN 1538-i; 69 frames, color, synchronized disc, 13 minutes) 7 Java U.S. Department of the Navy |
69 frames |
Filmstrip |
Color |
|
| 1943 |
Treatment of Jaw Fractures |
U.S. Department of the Navy |
25 min |
16mm |
Color |
Silent |
| 1943 |
Watertight Cover. Part 2: Assembly |
U.S. Department of the Navy |
18 min |
16mm |
|
|
| 1943 |
Weather Control During Instrument |
Flight. Part 1 U.S. Department of the Navy |
101 frames |
Filmstrip |
|
|
| 1943 |
Weather Control During Instrument |
Flight. Part 2 U.S. Department of the Navy |
78 frames |
Filmstrip |
|
|
| 1943 |
Wounds |
U.S. Department of the Navy |
20 min |
16mm |
Color |
|
| 1942 |
254 U.S. GOVERN |
How to Remove and Reinstall Radio Equipment LM-RU-GF-DU U.S. Department of the Navy |
46 frames |
Filmstrip |
|
|
| 1942 |
286 U. S. |
Sand Bag Bumping U.S. Department of the Navy |
|
Filmstrip |
|
|
| 1942 |
292 U. S. GOVERN |
Spray-Painting Equipment U.S. Department of the Navy |
|
Filmstrip |
|
|
| 1942 |
300 U. S. GOVE |
5372-e; 40 frames, color, synchronized disc, 10 minutes) Weather U.S. Department of the Navy |
77 frames |
Filmstrip |
|
|
| 1942 |
Air Ocean |
U.S. Department of the Navy |
70 frames |
Filmstrip |
|
|
| 1942 |
Aircraft Tires. Part 1: Maintenance |
and Repair U.S. Department of the Navy |
35 frames |
Filmstrip |
|
|
| 1942 |
Aircraft Tires. Part 1: Maintenance |
and Repair U.S. Department of the Navy |
35 frames |
Filmstrip |
|
|
| 1942 |
Aircraft Tires. Part 2: Maintenance |
and Repair U.S. Department of the Navy |
57 frames |
Filmstrip |
|
|
| 1942 |
Beaching and Launching VP Boats |
U.S. Department of the Navy |
64 frames |
Filmstrip |
|
|
| 1942 |
Brake and Landing Gear Mechanism |
Inspection. Pan 1 U.S. Department of the Navy |
|
Filmstrip |
|
|
| 1942 |
Brake and Landing Gear Mechanism |
Inspection. Part 2 U.S. Department of the Navy |
67 frames |
Filmstrip |
|
|