| 1943 |
Reassembly: 8-268 A Engine |
U.S. Department of the Navy |
24 min |
16mm |
|
|
| 1943 |
Rebasing Full Dentures |
U.S. Department of the Navy, 194 (Dental Prosthetic Laboratory Technique Series) Title self-explanatory. 5372-j; 40 frames, color, synchronized disc, 20 minutes) Reciprocating Engine Construction U.S. Coast Guard |
65 frames |
Filmstrip |
|
|
| 1943 |
Refueling the Airplane |
U.S. Department of the Navy |
40 frames |
Filmstrip |
|
|
| 1943 |
Rigging Changes After Flight |
U.S. Department of the Navy |
43 frames |
Filmstrip |
|
|
| 1943 |
Security and Refueling with Safety |
U.S. Department of the Navy |
30 min |
16mm |
|
|
| 1943 |
Servicing Hydraulic Systems |
U.S. Department of the Navy |
51 frames |
Filmstrip |
|
|
| 1943 |
Shallow Water Diving. |
U.S. Department of the Navy |
|
16mm |
|
|
| 1943 |
Skeletal Fixation by the Stader |
Splint: Fractures of the Oscalsis U.S. Department of the Navy |
10 min |
16mm |
|
|
| 1943 |
Skeletal Fixations of Fractures of |
the Mandible U.S. Department of the Navy |
9 min |
16mm |
Color |
|
| 1943 |
Supercharging Diesel Engines |
g U.S. Department of the Navy |
16 min |
16mm |
|
|
| 1943 |
Taxiing in Heavy Weather |
U.S. Department of the Navy |
|
16mm |
|
|
| 1943 |
Taxiing in Moderate Winds |
U.S. Department of the Navy |
13 min |
16mm |
|
|
| 1943 |
The Sextant: Surface. Parts 1, 2r |
and 3 U.S. Department of the Navy |
32 min |
16mm |
|
|
| 1943 |
Time In The Air. |
U.S. Department of the Navy |
12 min |
35mm |
|
sound |
| 1943 |
Time. Parts 1, 2 and 3 |
U.S. Department of the Navy |
57 min |
16mm |
|
|
| 1943 |
Tool Box. Part 1: Bottom and Sides |
U.S. Department of the Navy |
|
Filmstrip |
|
|
| 1943 |
Traditions, customs, civic duties, school, |
and army, physical training, character, psychology of a Japanese boy, Taru. (SN 1538-i; 69 frames, color, synchronized disc, 13 minutes) 7 Java U.S. Department of the Navy |
69 frames |
Filmstrip |
Color |
|
| 1943 |
Treatment of Jaw Fractures |
U.S. Department of the Navy |
25 min |
16mm |
Color |
Silent |
| 1943 |
Watertight Cover. Part 2: Assembly |
U.S. Department of the Navy |
18 min |
16mm |
|
|
| 1943 |
Weather Control During Instrument |
Flight. Part 1 U.S. Department of the Navy |
101 frames |
Filmstrip |
|
|
| 1943 |
Weather Control During Instrument |
Flight. Part 2 U.S. Department of the Navy |
78 frames |
Filmstrip |
|
|
| 1943 |
Wounds |
U.S. Department of the Navy |
20 min |
16mm |
Color |
|
| 1944 |
22 U. S. GOVER |
Brought To Action U.S. Department of the Navy |
21 min |
16mm |
|
|
| 1944 |
26 U. S. GOVERN |
currents on position of spot-light scope. (MN 2104-a; 15 minutes) 7, 4 The Cathode-Ray Oscilloscope U.S. Department of the Navy |
15 min |
16mm |
|
|
| 1944 |
290 U. S. G |
Simple Foundation U.S. Department of the Navy, (Shipbuilding Skills Series. The Shipfitter) Reviews material presented in motion pictures, "Simple Foundatio Parts 1, 2 and 3." (SN 2338-n; 9 frames) Simple Valves U.S. Department of the Navy |
65 frames |
Filmstrip |
|
|
| 1944 |
294 U. S. GOVERNME |
Synchro Systems. Part 2: Discussion U.S. Department of the Navy |
24 frames |
Filmstrip |
|
|
| 1944 |
A Technique for Amalgam |
ation U.S. Department of the Navy |
20 min |
16mm |
Color |
Silent |
| 1944 |
Aircraft Lubricants and Lubricating |
Equipment U.S. Department of the Navy |
54 frames |
Filmstrip |
|
|
| 1944 |
Aircrewmen of the Navy |
U.S. Department of the Navy |
15 min |
16mm |
|
|
| 1944 |
Bending Rings and Links |
U.S. Department of the Navy |
21 min |
16mm |
|
|
| 1944 |
Borneo and Celebes |
U.S. Department of the Navy |
91 frames |
Filmstrip |
Color |
|
| 1944 |
Chain of Asepsis |
U.S. Department of the Navy |
28 min |
16mm |
|
|
| 1944 |
Characteristics of Hydraulic Fluids |
U.S. Department of the Navy |
10 min |
16mm |
|
|
| 1944 |
Clinical Malaria |
the U.S. Department of the Navy |
11 min |
16mm |
|
|
| 1944 |
Construction of a Partial Maxillary |
and Mandibular Plate U.S. Department of the Navy |
24 min |
16mm |
Color |
Silent |
| 1944 |
Cooper Bessemer Diesel Engine Fuel System. |
U.S. Department of the Navy |
14 min |
16mm |
|
|
| 1944 |
Coppersmith: Working |
Branches From A Line U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
Corps 32, 41 |
; 20 Fine Grinding and Polishing: Flat Surfaces 32, 41 U.S. Department of the Navy with the cooperation of U.S. Office of Education |
30 min |
16mm |
|
|
| 1944 |
CTURES 153 |
5 Reassembly of Cylinder Head U.S. Department of the Navy |
14 min |
16mm |
|
|
| 1944 |
Department of Agriculture, 1948. |
Modern farm kitchen designed and built S by Bureau of Human Nutrition and Home U Economics to combine attractiveness and efficiency with minimum of stooping or f bending in work area arrangement. (14 a minutes, color) 32, 41 f (Stern Launching, DD445 Class U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
Diesel Engines: Reassembly |
U.S. Department of the Navy |
28 min |
16mm |
|
|
| 1944 |
Disassembly. Part 1 |
U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
Disassembly. Part 2 |
U.S. Department of the Navy |
14 min |
16mm |
|
|
| 1944 |
Ducks for market: Peking, Muscovy, |
Runner, and Mallard; brooding, feeding, and marketing methods; operation of on the large Long Island duck farm. (13 min- How to utes, silent) the 32, 41 mstrip, Duties of a Dental Technician 23; 15 U.S. Department of the Navy |
13 min |
16mm |
|
Silent |
| 1944 |
Emergency Rescue Equipment. Part |
1 Life Jackets and Belts: 32, 41 U.S. Department of the Navy |
11 min |
16mm |
|
|
| 1944 |
Engine Reassembly. Part 3 |
U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
Enroute Procedure |
41 U.S. Department of the Navy |
|
Filmstrip |
|
|
| 1944 |
Enroute Procedure d |
U.S. Department of the Navy |
|
Filmstrip |
|
|
| 1944 |
Establishing Construction Lines. Part |
4 1 U.S. Department of the Navy |
15 min |
16mm |
|
|
| 1944 |
Fine Grinding: Spherical Surfaces |
U.S. Office of Education with the cooperation of U. S. Department of the Navy |
44 frames |
Filmstrip |
|
|