| 1942 |
All Together |
Navy |
3 min |
16mm |
Color |
sound |
| 1942 |
Artificial Respiration |
United States Navy Training Film MN-836e-U |
|
|
|
|
| 1942 |
ASTRONOMICAL TRIANGLE, THE |
Department of the Navy (Department of Defense) |
37 min |
|
B&W |
Optical sound |
| 1942 |
AUDIO FREQUENCY AMPLIFICATION |
Department of the Navy (Department of Defense) |
25 min |
Filmstrip |
B&W |
Optical sound |
| 1942 |
Battle of Midway |
United States Navy |
600 |
|
|
|
| 1942 |
Beaching and Launching VP Boats |
U.S. Department of the Navy |
64 frames |
Filmstrip |
|
|
| 1942 |
Brake and Landing Gear Mechanism |
Inspection. Pan 1 U.S. Department of the Navy |
|
Filmstrip |
|
|
| 1942 |
Brake and Landing Gear Mechanism |
Inspection. Part 2 U.S. Department of the Navy |
67 frames |
Filmstrip |
|
|
| 1942 |
Cable Splicing. Part 1 |
U.S. Department of the Navy |
49 frames |
Filmstrip |
|
|
| 1942 |
Cable Splicing. Part 2 |
U.S. Department of the Navy |
45 frames |
Filmstrip |
|
|
| 1942 |
Capacitive Reactance |
U.S. Department of the Navy |
29 frames |
Filmstrip |
|
|
| 1942 |
Charts |
United States Navy |
22 |
16mm |
B&W |
sound |
| 1942 |
Checking Valves |
U.S. Department of the Navy |
55 frames |
Filmstrip |
|
|
| 1942 |
CITY OF ROME INCIDENT |
Department of the Navy (Department of Defense) |
5 min |
|
Color |
Optical sound |
| 1942 |
Cold Weather Starting |
U.S. Department of the Navy |
49 frames |
Filmstrip |
|
|
| 1942 |
Common Emergencies. Part 1 |
U.S. Department of the Navy |
59 frames |
Filmstrip |
|
|
| 1942 |
COPPERSMITH, THE - FLARING AND REDUCING |
Department of the Navy (Department of Defense) |
20 min |
|
B&W |
Optical sound |
| 1942 |
Corrosion |
U.S. Department of the Navy |
33 frames |
Filmstrip |
|
|
| 1942 |
Covering With Fabric tary |
U.S. Department of the Navy |
65 frames |
Filmstrip |
|
|
| 1942 |
DIESEL ENGINE, THE |
Department of the Navy (Department of Defense) |
29 min |
|
B&W |
Optical sound |
| 1942 |
DISASSEMBLY OF THE B-268A ENGINE |
Department of the Navy (Department of Defense) |
27 min |
|
B&W |
Optical sound |
| 1942 |
Draw Bench Operations |
U.S. Department of the Navy |
54 frames |
Filmstrip |
|
|
| 1942 |
Dressings and Bandages. Part 1 |
U.S. Department of the Navy |
52 frames |
Filmstrip |
|
|
| 1942 |
Dressings and Bandages. Part 2 |
U.S. Department of the Navy |
|
Filmstrip |
|
|
| 1942 |
Engine Instruments |
U.S. Department of the Navy |
60 frames |
Filmstrip |
|
|
| 1942 |
First Aid Series) How to treat skull, |
ose, jaw, spine, rib, pelvis, thigh, kneeap, foot, toe fractures. Five general aid rules. irst Straight photography and rawings. (SN 223-6; 55 frames, synhronized disc, 13 minutes) ractures. Part 3.S. Department of the Navy |
55 frames |
Filmstrip |
|
|
| 1942 |
First Aid Series) Two principal types |
f fractures; how to treat leg, forearm, pper arm, elbow, finger, and collarbone ractures. Straight photography and rawings. (SN 223-a; 55 frames t synhronized disc, 12 minutes) ractures. Part 2.S. Department of the Navy |
55 frames |
Filmstrip |
|
|
| 1942 |
FIRST IMPRESSIONS |
Department of the Navy (Department of Defense) |
21 min |
16mm |
B&W |
Optical sound |
| 1942 |
FIRST IMPRESSIONS (SPANISH) |
Department of the Navy (Department of Defense) |
21 min |
|
B&W |
Optical sound |
| 1942 |
Forming Outside and Inside Flanges c |
U.S. Department of the Navy |
51 frames |
Filmstrip |
|
|
| 1942 |
Fueling Seaplanes |
U.S. Department of the Navy |
67 frames |
Filmstrip |
|
|
| 1942 |
Getting Ready to Instruct |
U.S. Department of the Navy |
94 frames |
Filmstrip |
|
|
| 1942 |
Good Form at Key and Phones |
U.S. Department of the Navy |
46 frames |
Filmstrip |
|
|
| 1942 |
GOVERNMENT FILMS |
nized Forces in Flight U.S. Department of the Navy |
72 frames |
Filmstrip |
|
|
| 1942 |
Grill |
Form Blocks and Forming Re- U.S. Department of the Navy |
67 frames |
Filmstrip |
|
|
| 1942 |
Hydraulic Mechanisms |
U.S. Department of the Navy |
50 frames |
Filmstrip |
|
|
| 1942 |
Induction System Icing |
U.S. Department of the Navy |
77 frames |
Filmstrip |
|
|
| 1942 |
Inspecting the External Fuel System. |
Part 1 U.S. Department of the Navy |
36 frames |
Filmstrip |
|
|
| 1942 |
Introduction. Parts 1 and 2 |
U.S. Department of the Navy |
22 min |
16mm |
|
|
| 1942 |
MACARTHUR BLASTS JAPANESE FROM NEW GUINEA [ETC.] |
United States Navy |
|
16mm/video file |
|
|
| 1942 |
Maintenance of Storage Batteries |
U.S. Department of the Navy |
52 frames |
Filmstrip |
|
|
| 1942 |
Make Your Chalk Talk |
U.S. Department of the Navy |
56 frames |
Filmstrip |
|
|
| 1942 |
MARINE DIESEL ENGINES FOR POWER BOATS |
Department of the Navy (Department of Defense) |
16 min |
|
B&W |
Optical sound |
| 1942 |
Measuring Electrical Units. Part 2 |
U.S. Department of the Navy |
38 frames |
Filmstrip |
|
|
| 1942 |
Men For The Fleet. |
US Navy Dept |
1 reel |
|
|
Sound |
| 1942 |
MEN MAKE THE NAVY.. THE NAVY MAKES MEN |
U.S. Navy |
|
|
|
|
| 1942 |
Methods of Starting the Engine |
U.S. Department of the Navy |
45 frames |
Filmstrip |
|
|
| 1942 |
Minor Injuries |
U.S. Department of the Navy |
65 frames |
Filmstrip |
|
|
| 1942 |
Oral Hygiene |
U.S. Department of the Navy |
10 min |
16mm |
|
Silent |
| 1942 |
Personnel Damage Control: Artificial Respiration |
United States Navy |
|
|
|
|