| 1944 |
Painting Ships Bottoms: Hot and |
Cold Plastic; Anti-Fouling Paint U.S. Department of the Navy |
10 min |
16mm |
|
|
| 1944 |
Photography fights |
The United States Navy |
0:13:00 |
16mm |
B&W |
sound |
| 1944 |
Placing Sliding Ways |
U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
Preflight Procedure |
U.S. Department of the Navy |
52 frames |
Filmstrip |
|
|
| 1944 |
Principles of Operation (AN/ARN-1) |
U.S. Department of the Navy |
67 frames |
Filmstrip |
|
|
| 1944 |
RADIO MAN FIGHT, THE |
Department of the Navy (Department of Defense) |
10 min |
|
B&W |
Optical sound |
| 1944 |
Rectangular coordinates |
Department of the Navy (Department of Defense) |
13 min |
16mm |
B&W |
Optical sound |
| 1944 |
Relative Movement. Part 1: Relative |
Movement and Interception: Air U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
Relative Movement. Part 2: Out and |
In Search: Relative Wind U.S. Department of the Navy |
12 min |
16mm |
|
|
| 1944 |
Removal and Replacement of Main |
Bearings U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
Removal of Cylinder Liner |
U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
Removal of Injection Nozzles, Etc. |
U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
Removal of Pistons |
U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
Replacement of Cylinder Liner |
U.S. Department of the Navy |
27 min |
16mm |
|
|
| 1944 |
Replacement of Injection Nozzles, |
Etc. U.S. Department of the Navy |
6 min |
16mm |
|
|
| 1944 |
Replacement of Pistons |
U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
RETURN TO GUAM |
U.S. Navy |
18min |
16mm |
|
Sound |
| 1944 |
RIGGING BLOCKS |
Department of the Navy (Department of Defense) |
11 min |
16mm |
B&W |
Optical sound |
| 1944 |
RIGID AND SWINGING STAGING |
Department of the Navy (Department of Defense) |
18 min |
|
B&W |
Optical sound |
| 1944 |
ROUGH GRINDING WITH A CURVATURE GENERATOR |
Department of the Navy (Department of Defense) |
15 min |
|
B&W |
Optical sound |
| 1944 |
Rough Grinding: Spherical Surfaces |
U.S. Office of Education with the cooperation of the U.S. Department of the Navy |
57 frames |
Filmstrip |
|
|
| 1944 |
Safety for Welders: Use of Welding |
Protective Equipment U.S. Department of the Navy |
7 min |
16mm |
|
|
| 1944 |
Safety in Navy Yards |
U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
SERIES AND PARALLEL CIRCUITS |
Department of the Navy (Department of Defense) |
8 min |
|
B&W |
Optical sound |
| 1944 |
Skills Series. Sheetmetal |
(Shipbuilding Work) Triangulation method in development of a pattern from making blueprint to full scale plan; cutting the metal; dressing; hammering; and checking for squareness. Supplementary filmstrip, same title, also available. (MN 2339-d; 17 filmminutes) (OE 41 2, 41 Transmission Security U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
SLINGING LOAD |
Department of the Navy (Department of Defense) |
17 min |
16mm |
B&W |
Optical sound |
| 1944 |
SO PROUDLY WE SERVE |
US Navy Dept |
20 min |
|
|
Sound |
| 1944 |
Spherical Surfaces |
k U.S. Office of Education, with the cooperation of the U.S. Department of the Navy |
27 min |
16mm |
|
Sound |
| 1944 |
STORY OF THE BLACK CATS, THE |
Department of the Navy (Department of Defense) |
19 min |
|
B&W |
Optical sound |
| 1944 |
Superheat Control |
U.S. Department of the Navy, 19 (Fireroom Operation Series) How light off saturated furnace; light superheater when steam reaches 600 I increase superheat temperature; secure superheater. (MN 2356-f; minutes) Supervising Women Workers U.S. Office of Education |
11 min |
16mm |
|
|
| 1944 |
Synchro systems. Part 1 |
U.S. Department of the Navy |
13 min |
16mm |
|
|
| 1944 |
TAURUS-GULF TRADE INCIDENT, THE |
Department of the Navy (Department of Defense) |
3 min |
|
B&W |
Optical sound |
| 1944 |
THAT MEN MAY FIGHT |
US Navy Dept |
20 min |
|
|
Sound |
| 1944 |
THE BATTLE |
US Navy Dept |
20 min |
|
|
Sound |
| 1944 |
The Battle For The Marianas. |
US Navy |
20min |
16mm |
Color |
Sound |
| 1944 |
THE BLACK CATS |
US Navy indus incentive div |
18min |
16mm |
|
Sound |
| 1944 |
TION PICTURES 173 |
Simple Foundation. Part 2: Duplication and Fabrication U.S. Department of the Navy |
16 min |
16mm |
|
|
| 1944 |
TUBE TESTER OPERATION |
Department of the Navy (Department of Defense) |
9 min |
|
B&W |
Optical sound |
| 1944 |
USE AND CARE OF WIRE ROPE |
Department of the Navy (Department of Defense) |
18 min |
|
B&W |
Optical sound |
| 1944 |
V: Air. Part 1 |
U.S. Department of the Navy |
15 min |
16mm |
|
|
| 1944 |
Watertight Cover. Part 1: Layout |
and Fabrication U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
Weather for the Navigator |
U.S. Department of the Navy |
9 min |
16mm |
|
|
| 1944 |
Weather Map Symbols: Navy Quiz |
No. 44 U.S. Department of the Navy |
87 frames |
Filmstrip |
|
|
| 1944 |
WINGS OVER LEYTE |
US Navy indus incentive div |
11min |
16mm |
|
Sound |
| 1943 |
"Take a Letter Please]" How to Dictate |
United States Navy |
22 |
16mm |
B&W |
sound |
| 1943 |
288 U.S. GOVER |
Servicing Hydraulic Systems U.S. Department of the Navy |
49 frames |
Filmstrip |
|
|
| 1943 |
Advanced Typing - Duplicating And Manuscript |
United States Navy; Calvin Productions; Castle Films |
25 min |
16mm |
B&W |
sound |
| 1943 |
Advanced Typing - Shortcuts |
U.S. Navy |
35 min |
16mm |
B&W |
sound |
| 1943 |
Airway Aids |
U.S. Department of the Navy |
73 frames |
Filmstrip |
|
|
| 1943 |
Airway Aids |
U.S. Department of the Navy |
73 frames |
Filmstrip |
|
|