| 1944 |
RIGGING BLOCKS |
Department of the Navy (Department of Defense) |
11 min |
16mm |
B&W |
Optical sound |
| 1944 |
RIGID AND SWINGING STAGING |
Department of the Navy (Department of Defense) |
18 min |
|
B&W |
Optical sound |
| 1944 |
ROUGH GRINDING WITH A CURVATURE GENERATOR |
Department of the Navy (Department of Defense) |
15 min |
|
B&W |
Optical sound |
| 1944 |
Rough Grinding: Spherical Surfaces |
U.S. Office of Education with the cooperation of the U.S. Department of the Navy |
57 frames |
Filmstrip |
|
|
| 1944 |
Safety for Welders: Use of Welding |
Protective Equipment U.S. Department of the Navy |
7 min |
16mm |
|
|
| 1944 |
Safety in Navy Yards |
U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
SERIES AND PARALLEL CIRCUITS |
Department of the Navy (Department of Defense) |
8 min |
|
B&W |
Optical sound |
| 1944 |
Skills Series. Sheetmetal |
(Shipbuilding Work) Triangulation method in development of a pattern from making blueprint to full scale plan; cutting the metal; dressing; hammering; and checking for squareness. Supplementary filmstrip, same title, also available. (MN 2339-d; 17 filmminutes) (OE 41 2, 41 Transmission Security U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
SLINGING LOAD |
Department of the Navy (Department of Defense) |
17 min |
16mm |
B&W |
Optical sound |
| 1944 |
Spherical Surfaces |
k U.S. Office of Education, with the cooperation of the U.S. Department of the Navy |
27 min |
16mm |
|
Sound |
| 1944 |
STORY OF THE BLACK CATS, THE |
Department of the Navy (Department of Defense) |
19 min |
|
B&W |
Optical sound |
| 1944 |
Superheat Control |
U.S. Department of the Navy, 19 (Fireroom Operation Series) How light off saturated furnace; light superheater when steam reaches 600 I increase superheat temperature; secure superheater. (MN 2356-f; minutes) Supervising Women Workers U.S. Office of Education |
11 min |
16mm |
|
|
| 1944 |
Synchro systems. Part 1 |
U.S. Department of the Navy |
13 min |
16mm |
|
|
| 1944 |
TAURUS-GULF TRADE INCIDENT, THE |
Department of the Navy (Department of Defense) |
3 min |
|
B&W |
Optical sound |
| 1944 |
TION PICTURES 173 |
Simple Foundation. Part 2: Duplication and Fabrication U.S. Department of the Navy |
16 min |
16mm |
|
|
| 1944 |
TUBE TESTER OPERATION |
Department of the Navy (Department of Defense) |
9 min |
|
B&W |
Optical sound |
| 1944 |
USE AND CARE OF WIRE ROPE |
Department of the Navy (Department of Defense) |
18 min |
|
B&W |
Optical sound |
| 1944 |
V: Air. Part 1 |
U.S. Department of the Navy |
15 min |
16mm |
|
|
| 1944 |
Watertight Cover. Part 1: Layout |
and Fabrication U.S. Department of the Navy |
|
16mm |
|
|
| 1944 |
Weather for the Navigator |
U.S. Department of the Navy |
9 min |
16mm |
|
|
| 1944 |
Weather Map Symbols: Navy Quiz |
No. 44 U.S. Department of the Navy |
87 frames |
Filmstrip |
|
|
| 1943 |
288 U.S. GOVER |
Servicing Hydraulic Systems U.S. Department of the Navy |
49 frames |
Filmstrip |
|
|
| 1943 |
Airway Aids |
U.S. Department of the Navy |
73 frames |
Filmstrip |
|
|
| 1943 |
Airway Aids |
U.S. Department of the Navy |
73 frames |
Filmstrip |
|
|
| 1943 |
Altitude |
U.S. Department of the Navy |
|
Filmstrip |
|
|
| 1943 |
APPLICATION OF PASCAL'S LAW, PT 1 |
Department of the Navy (Department of Defense) |
13 min |
|
B&W |
Optical sound |
| 1943 |
APPLICATION OF PASCAL'S LAW, PT 2 |
Department of the Navy (Department of Defense) |
15 min |
|
B&W |
Optical sound |
| 1943 |
Beach Approaches |
U.S. Department of the Navy |
41 min |
16mm |
|
|
| 1943 |
BEARING REASSEMBLY |
Department of the Navy (Department of Defense) |
11 min |
16mm |
B&W |
Optical sound |
| 1943 |
BEARING REMOVAL AND INSPECTION, 8-268A ENGINE |
Department of the Navy (Department of Defense) |
17 min |
|
B&W |
Optical sound |
| 1943 |
BEAVER SELJA INCIDENT, THE |
Department of the Navy (Department of Defense) |
5 min |
|
B&W |
Optical sound |
| 1943 |
Behind The Shop Drawing. |
Department of the Navy (Department of Defense) |
10 min |
Filmstrip |
B&W |
Optical sound |
| 1943 |
Bench Work: 8-268A Engine |
U.S. Department of the Navy |
16 min |
16mm |
|
|
| 1943 |
BMEP |
U.S. Department of the Navy |
|
16mm |
|
|
| 1943 |
BOARDING PROCEDURES |
Department of the Navy (Department of Defense) |
13 min |
|
Color |
Optical sound |
| 1943 |
Bomb Blast and Burns |
40. U.S. Department of the Navy |
13 min |
16mm |
Color |
|
| 1943 |
Capacitance: Parts 1 and 2 |
U.S. Department of the Navy |
30 min |
16mm |
|
|
| 1943 |
Care and Repair of Flight Controls |
U.S. Department of the Navy |
68 frames |
Filmstrip |
|
|
| 1943 |
CATHODE RAY TUBE, THE - HOW IT WORKS |
Department of the Navy (Department of Defense) |
1 min |
|
B&W |
Optical sound |
| 1943 |
Charging storage batteries. |
Department of the Navy (Department of Defense) |
5:40 |
16mm |
B&W |
sound |
| 1943 |
Cleaning the Airplane |
U.S. Department of the Navy |
41 frames |
Filmstrip |
|
|
| 1943 |
Diesel Engine Governors. Part 2: |
GM Series 71, Limiting Speed Mechanical Governor U.S. Department of the Navy |
12 min |
16mm |
|
|
| 1943 |
Diesel Engine Marquette Hydraulic |
Governors: Basic Hydraulic Governor U.S. Department of the Navy |
17 min |
16mm |
|
|
| 1943 |
DIESEL ENGINES |
Department of the Navy (Department of Defense) |
15 min |
|
B&W |
Optical sound |
| 1943 |
DISCIPLINE - REPRIMANDING (SPANISH) |
Department of the Navy (Department of Defense) |
10 min |
|
B&W |
Optical sound |
| 1943 |
Emergency Seaplane Repair |
U.S. Department of the Navy |
43 frames |
Filmstrip |
|
|
| 1943 |
Factors in the Construction of Full |
Mandibular and Maxillary Denture U.S. Department of the Navy |
40 min |
16mm |
Color |
|
| 1943 |
Fillet Welds |
U.S. Department of the Navy |
|
Filmstrip |
|
|
| 1943 |
G and You |
U.S. Department of the Navy |
|
16mm |
|
|
| 1943 |
GOVERNMENT FILMS |
form nized microgroove disc, 14 minutes, or discript) uire- Oil Systems U.S. Department of the Navy |
52 frames |
Filmstrip |
|
|