| 1946 |
Race Track Patterns. Part 2. |
U.S. Department of the Navy |
21 min |
16mm |
|
|
| 1946 |
REPORT FROM TOKYO |
45. U.S. Department of the Navy |
19 min |
16mm |
|
sound |
| 1946 |
Safe Handling of Compressed Gases |
U.S. Department of the Navy |
|
Filmstrip |
|
|
| 1946 |
Silent Service |
U.S. Department of the Navy |
|
16mm |
|
|
| 1945 |
Action of the Extra-Ocular Muscles |
U.S. Department of the Navy |
8 min |
16mm |
Color |
|
| 1945 |
Assignment Home |
U.S. Department of the Navy |
25 min |
16mm |
|
|
| 1945 |
Automobile Operation No. 5) What a |
driver should do to locate and correct minor car troubles; and how to recognize symptoms of impending trouble. Supplementary same title, also filmstrip, available. (OE 490; 12 minutes) 41 32, 41 The True Fade System U.S. Department of the Navy |
12 min |
16mm |
|
|
| 1945 |
BEFORE YOU FLY |
Prodisas- U.S. Department of the Navy |
35 min |
16mm |
|
|
| 1945 |
Benchwork. Part 1 |
U.S. Department of the Navy |
12 min |
16mm |
|
|
| 1945 |
Benchwork. Part 2 |
U.S. Department of the Navy |
19 min |
16mm |
|
|
| 1945 |
Benchwork. Part 3 |
U.S. Department of the Navy |
12 min |
16mm |
|
|
| 1945 |
Benchwork. Part 4 |
U.S. Department of the Navy |
|
16mm |
|
|
| 1945 |
Care and Operation of Gun Cameras |
U.S. Department of the Navy |
22 min |
16mm |
|
|
| 1945 |
Cleaning Mess Gear |
U.S. Department of the Navy |
20 min |
16mm |
|
|
| 1945 |
Crash Fire Rescue |
U.S. Department of the Navy |
|
16mm |
|
|
| 1945 |
Directional Valves |
U.S. Department of the Navy |
|
Filmstrip |
|
|
| 1945 |
Drinking Water |
U.S. Department of the Navy |
5 min |
16mm |
|
|
| 1945 |
Evacuation of Casualties: Saipan |
U.S. Department of the Navy |
23 min |
16mm |
|
|
| 1945 |
F 5; Signal Generator Operation |
U.S. Department of the Navy |
9 min |
16mm |
|
|
| 1945 |
Field Management of Eye Injuries |
U.S. Department of the Navy |
20 min |
16mm |
Color |
|
| 1945 |
Fleet That Came to Slay |
U.S. Department of the Navy |
22 min |
16mm |
|
|
| 1945 |
Fore Poppets and Internal Shoring |
Construction U.S. Department of the Navy |
75 frames |
Filmstrip |
|
|
| 1945 |
Ground Ways |
U.S. Department of the Navy |
|
16mm |
|
|
| 1945 |
Hatch Canopy |
n- U.S. Department of the Navy |
90 frames |
Filmstrip |
|
|
| 1945 |
Head Injury |
U.S. Department of the Navy |
10 min |
16mm |
Color |
|
| 1945 |
Hemolytic Streptococcus Control |
U.S. Department of the Navy |
13 min |
16mm |
|
|
| 1945 |
Liner and Piston |
U.S. Department of the Navy |
17 min |
16mm |
|
|
| 1945 |
Maintenance of Plexiglass and Lucite |
U.S. Department of the Navy |
|
16mm |
|
|
| 1945 |
Maintenance, and |
Installation, spection U.S. Department of the Navy |
11 min |
16mm |
|
|
| 1945 |
Manufacture and Usage |
U.S. Department of the Navy |
|
16mm |
|
|
| 1945 |
Methods of Operating Valves |
U.S. Department of the Navy |
50 frames |
Filmstrip |
|
|
| 1945 |
Multiple Wounds |
U.S. Department of the Navy |
|
16mm |
|
|
| 1945 |
Native Food |
m U.S. Department of the Navy |
|
16mm |
|
|
| 1945 |
Navy Chaplain, Photo Report |
U.S. Department of the Navy |
15 min |
16mm |
|
|
| 1945 |
Orientation: Fade Parallel |
S and Close-in Procedure U.S. Department of the Navy |
10 min |
16mm |
|
|
| 1945 |
Orientation: The 90 Degree System |
U.S. Department of the Navy |
|
16mm |
|
|
| 1945 |
Packing, Stowage and Handling |
U.S. Department of the Navy |
5 min |
16mm |
|
|
| 1945 |
Reassembly: Head |
U.S. Department of the Navy |
26 min |
16mm |
|
|
| 1945 |
Reassembly: Liner and Piston |
U.S. Department of the Navy |
22 min |
16mm |
|
|
| 1945 |
Rehabilitation: Voyage to Recovery |
U.S. Department of the Navy |
30 min |
16mm |
Color |
|
| 1945 |
Removal of Intraocular Foreign |
Bodies U.S. Department of the Navy |
|
16mm |
|
|
| 1945 |
Revision and Reamputation of the |
Lower Extremity Stump U.S. Department of the Navy |
27 min |
16mm |
Color |
|
| 1945 |
Sciatic Pain and the Inlervertebral |
Disk U.S. Department of the Navy |
33 min |
16mm |
Color |
|
| 1945 |
Silver Brazing Techniques. Part 2 |
U.S. Department of the Navy |
18 min |
16mm |
|
|
| 1945 |
Towing Operations: Ocean Towing |
as Applied to Wooden Rescue Tugs U.S. Department of the Navy |
17 min |
16mm |
|
|
| 1945 |
Transition Piece, Square to Ro |
Layout and Fabrication U.S. Department of the Navy, (Shipbuilding Skills Series. Sheetmetal Work) Reviews material presented in motion picture, same title. (SN 2339-p 45 frames) Transmission, Drive Shaft, and Differential U.S. Office of Education |
33 frames |
Filmstrip |
|
|
| 1945 |
Trench Foot |
U.S. Department of the Navy |
11 min |
16mm |
Color |
|
| 1945 |
Wounds of the Face and Jaw |
U.S. Department of the Navy |
20 min |
16mm |
Color |
|
| 1945 |
Wounds of the Hand |
U.S. Department of the Navy |
14 min |
16mm |
Color |
|
| 1944 |
22 U. S. GOVER |
Brought To Action U.S. Department of the Navy |
21 min |
16mm |
|
|