LAYING OUT, DRILLING AND TAPPING FLANGES ON SEA CHEST
Sign in to track this film in your collection or want list.
Series: Shipbuilding Skills Series
Duration: 19 min
Year Published: 1944
Creator: Castle Films
Format: 16mm
Sound: Sound
Description: Produced by US Office of education. Shows the component parts of a sea chest; how sea chests function; how flanges are prepared for valve installation; how locations of flanges are checked; how flanges are leveled to make metal-to-metal contact with valve bearing surfaces; and how stud holes are drilled and tapped. This is No. 4 in the sub-series Marine machinery installation in the Shipbuilding skills series.
Complete Record: Series: Shipbuilding skills series Dewey number: 623.8 Audience level: trade-adult Guide Format/cost: 16-sd-$27.10 Distributors / rental: Bell & Howell Company; A. H. Rice and Company; Calhoun Company; Sunray Films Company; Dayton Film Rental Libraries; Wilfred Naylor; Visual Art Films $27.10; Ideal Pictures Corporation
Metadata Source:Educational Film Guide 1946
No holdings listed.
Related films:
- FILING AND INSTALLING CHOCKS (1944) · Office of Education (Department of Health, Education, and Welfare)
- HOW TO CHECK AND SURFACE FOUNDATIONS (1944) · Castle Films
- BULKHEAD: SETTING TRANSVERSE WATERTIGHT BULKHEAD INTO HULL (1942) · Castle Films
- DECK GIRDERS: SUB-ASSEMBLY (1942) · Castle Films
- PREPARING AND SETTING A KEEL BLOCK AND BOTTOM CRADLE (1942) · Castle Films
- SIDE SUB-ASSEMBLY OF A WEB FRAME (1942) · Castle Films
- MEASURING PIPE, TUBING AND FITTINGS (1944) · Office of Education (Department of Health, Education, and Welfare)
- MAKING A COLD BEND ON A HAND POWERED MACHINE (1944) · Office of Education (Department of Health, Education, and Welfare)
Record added: 2026-07-02 14:42:46