Eppalock: the first six months
Sign in to track this film in your collection or want list.
The Soil Conservation Authority’s first six months work on the big Eppalock catchment project, in which the Authority is cooperating with government departments, landholders and local councils to apply soil conservation measures to the whole of an 800 square mile catchment to ensure that only pure silt free water reaches the Eppalock Reservoir.
Sources
- 16mm Filmography (legacy record) — title, description, catalog record
Original permalink · Record added 2026-01-23 03:28:18