Correction of Boiler Foaming, The

Duration: 30 min

Format: 16mm

Description: Results of standing tests; conditions inside of boiler while the locomotive is in actual road service; and the results of laboratory work in connection with the boiler water studies.

Complete Record: Category: Other Industries Subcategory: Railroad Industry Type: Motion Picture Source: Electro Chemical Eng

Metadata Source:Index of Training Films 1946


No holdings listed.


No related films.