CHECKING THE SYSTEM. PART I: GENERAL PROCEDURES
Sign in to track this film in your collection or want list.
Series: Refrigeration service series
Duration: 17 min
Year Published: 1945
Creator: Castle Films
Format: 16mm
Sound: Sound
Description: Produced by US Office of education. Shows how to install gages in a domestic refrigerator; how to check operating pressures, compressor performance, and the temperature range of the cooling coil; and how to clean the condenser and oil the motor of an open-type refrigeration unit.
Complete Record: Series: Refrigeration service series Dewey number: 621.5 Audience level: sh-c-trade-adult Guide Format/cost: 16-sd-$24.60 Distributors / rental: Bell & Howell Company $1.50; Sunray Films Company; Dayton Film Rental Libraries; Visual Art Films $24.60; Wilfred Naylor; A. H. Rice and Company
Metadata Source:Educational Film Guide 1946
No holdings listed.
Related films:
- ADJUSTING AND REPAIRING THE THERMO EXPANSION (1945) · Anson Bond Productions
- ADJUSTING AND REPAIRING THE THERMO EXPANSION VALVE (1945) · Castle Films
- PRINCIPLES OF REFRIGERATION (1945) · Castle Films
- REMOVING AND INSTALLING A COOLING UNIT · Castle Films
- CHECKING THE ELECTRICAL SYSTEM (1945) · Castle Films
- CHECKING THE SYSTEM. PART II: TROUBLE SHOOTING (1945) · Castle Films
- MAKING AND REPAIRING TUBING CONNECTIONS (1944) · Office of Education (Department of Health, Education, and Welfare)
- Checking and replacing a float valve (1945) · Office of Education (Department of Health, Education, and Welfare)
Record added: 2026-07-02 14:20:01