Army Air Forces threading the arming wire of a bomb

Transcription

in threading the wire through the nose fuse it is necessary to use a fond stock clip over the end of the wire to hold it in position in threading the arming wire through the tail fuse the wire passes through a hole in a restraining pin which is held secure by a tight spring after arming wires are attached the fused bombs start their final Journey on trailers before leaving the bomb storage area however each load is checked at the gate by a guard the bombs are then taken to the airplane bomb service Point designated by the air Drome Commander


1 user has this film:
Periscope Film


No related films.